Safety Notice for 3-Wire 240 VAC Models

(Includes 880 Altamar, Cameo, Capri, Majesta, Marin, Maxxus, Optima Models, 780 Camden,

Certa, Chelsee, Hamilton Models And 680 Burlington Hartford, Hawthorne Models)

Refer to page 14 for 3-wire 120 VAC or 4-wire 120/240 VAC powered models.

Proper grounding is extremely important. A pressure wire connector is provided to permit connection
of a bonding wire between the spa and any metal object or appliance within 5 feet. Bonding wire
must be at least #8 AWG (8.4 mm

2

) solid copper wire.

1. To gain access to the spa’s power terminal strip, remove the four screws securing the center

synthetic cabinet panel on the control panel side of the spa. After removing the cabinet panel,
remove the four control box cover screws (Figures 2-3).

2. Inlets are provided to allow the power supply to enter the equipment area from either side of

the spa near the base (Figure 2). Select the inlet you want to use, then feed the power cable
through to the control box.

3. Install the power cable with a connector through the large opening provided at the bottom of

the control box (Figure 3).

4. Connect power wires, color to color, to main TB1 terminal strip (Figures 4A-4B) and tighten

securely.

5. Reinstall control box door and side cabinet panel. Electrical installation is now complete.