Sundance Spas 850 Series User Manual

Page 9

Advertising
background image



**Note: A pressure
sensitive terminal
block is provided
on the outside
surface of the
load box to permit
connection of
a bonding wire
between this
point and any
metal equipment
chassis, metal
water pipe, or
metal conduit
within 5 feet (1.5
m) of the spa.
The bonding wire
must be at least
#8 AWG (8.4 mm

2

)

solid copper wire.
Before installing
this spa, check
with local the
local building
department to
ensure installation
conforms to local
building codes.

Red (L2)

Pigtail

Neutral Bus

Ground

TB2

TB1

Black (L1)

Green

Main

Service

Panel

with

GFCI

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

2-Pole Circuit Breaker with 2-Wire Grounded Load Connection

(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)

White (N)

Black (L1)

Red (L2)

240 VAC

No Load Neutral Wire

Note: service disconnect not
shown in this diagram.
The control box TB1 terminal
position varies between models.

B

R

Hot T

ub

Contr

ol Bo

x

Red (L2)

Red (L2)

Pigtail

Neutral Bus

Ground

TB2

Black (L1)

Black (L1)

Green

GFCI Sub Panel*

Main Panel*

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

No Load Neutral Wire

Main Panel with Secondary GFCI Shut-Off Box Using a

2-Pole GFCI Breaker with 2-Wire Grounded Connection

(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)

TB1

White (N)

Green (Ground)

*GFCI Sub Panel commonly
used when recommended GFCI
does not install in Main Panel.

Note: service disconnect not
shown in this diagram.
The control box TB1 terminal
position varies between models.

B

R

Hot T

ub

Contr

ol Bo

x

3 - Wire 240VAC Wiring Diagrams (US/Canada 60Hz)

(Includes 880 Altamar, Cameo, Capri, Majesta, Marin, Maxxus, Optima Models, 780 Camden,

Certa, Chelsee, Hamilton Models, And 680 Burlington, Hartford, Hawthorne Models)

Diagrams Illustrate
Standard Wiring
Practices.

Advertising