Snapper 1685336 User Manual

Page 3

Advertising
background image

Figure 7A. 4 2 ” Blade Group 1

Figure 76. 42” Blade Group 2

Member

From Top Down

Figure 7D. 42” Blade Group 4

Figure 7E. 46” Blade Group 3

Figure 7C. 42” Blade Group 3

Figure 7F. 46” glade Group 4

Figures 7A

7F. Spring Installation

8 . Lower push bar and install dozer blade with kingpin

(A,

spring clip, and pivot pin(B). Reattach

rod guide (D) and secure with cotter pin (C).

9. Tighten

(A,

4 or 5) and nut which

hold chain to tractor frame.

Perform Lift Rod Adjustment as instructed in

Operator’s Manual for your Snow Plow/Dozer
Blade.

Advertising