Maintenance schedule – SPX Cooling Technologies MARLEY AV 98-1514E User Manual

Page 27

Advertising
background image

27

Maintenance Schedule

Maintenance Service

Monthly

Semi-annually

Seasonal Startup or annually

Inspect General Condition and Operation

x

x

Observe Operation of:

Mechanical–motor, fan and drive mechanism

x

x

Makeup valve (if equipped)

x

x

Inspect for unusual noise or vibration

x

x

inspect and Clean:

Air inlet

x

x

PVC drift eliminators

x

x

Distribution basin, nozzles and collection basin

x

x

Fan motor exterior

x

x

Check:

Collection water basin level

x

x

Blowdown–adjust as required

x

x

Belt drive:

Fan shaft bearing lubrication (every 3 mo.)

every 3 months

every 3 months

Check and tighten support fasteners

x

Check shaft, sheave and belt alignment

x

Check belt tension and condition

x

x

Check sheave bushing fastener torque

x

Fan:

Check and tighten blade and hub fasteners

x

Check fan blade pitch and tip clearance

x

Check fan cylinder for loose fasteners

x

Motor:

Lubricate (grease as required)

R

Check mounting bolts for tightness

x

Operate at least

3 hours a month

3 hours a month

3 hours a month

Basin Heater (if equipped):

Check for proper operation of temp/low water level sensor

x

Inspect/clean buildup of contaminant from sensor

x

x

Structure:

Inspect/tighten all fasteners

x

x

Inspect and touch up all metal surfaces

x

R — Refer to Component User Manual
Note: It is recommended at least weekly, that the general operation and condition be observed. Pay

attention to any changes in sound or vibration that may signify a need for closer inspection.

Advertising