SECTION 2: BOILER INSTALLATION

STEP 1: LOCATING AND SETTING THE BOILER

PROCEDURE A: Check that provisions for combustion air are in accordance with National Fuel Gas

Code ANSI Z223.1-latest edition and all applicable local codes. In Canada, follow CAN/CGA B149(.1 or .2)
installation codes.

58" FOR GB250-S-8 THRU GB250-S-9

1

1

1

1

1

1

1

1

1

1

1

1

1

RECOMMEND
MORE FOR
ACCESS TO
VENT DAMPER
POSITION
INDICATOR

12"

* TOP

6"

6"

VENT DAMPER

12"

18"

* 52" FOR GB250-S-5L THRU GB250 S-7

PROCEDURE B:

Check minimum
clearances to
combustibles are
proper as shown. Local
requirements may
specify greater
clearances & must be
adhered to.

Boiler shall be install-
ed such that the gas
ignition system com-
ponents are protected
from water (dripping,
spraying, rain, etc.)
during appliance oper-
ation and service.

WARNING: Never install boiler on combustible flooring without combustible flooring pan or on carpeting
as heat damage and/or fire may result.

FIGURE 2.1

5

Step 1 Continued On Next Page

NOTE: Do not loosen tie rods on absorption unit. They accommodate thermal expansion. Loss of boiler
structural integrity and water leaks/damage may result.

CAUTION: Locate boiler so horizontal connecting flue pipe is as short as possible. Maximize height of
vertical flue connector.