Tube component assembly, Baffle installation – Snapper 1733866 User Manual

Page 7

Advertising
background image

5

Tube Component Assembly

Baffle Installation

1. Determine which baffle to use. See Figure 4 Chart.

2. Lift side discharge chute (H, Figure 4).

3. Insert baffle (F) through discharge opening and posi-

tion baffle into place.

4. Tighten carriage bolts (A) and nuts (E) on baffle (F).

5. Tighten carriage bolt (B) and nut (E) on baffle (F).

6. Position baffle (G) into place.

7. Tighten carriage bolts (C) and nuts (E) on baffle (G).

8. Tighten carriage bolts (D) and nuts (E) on baffle (G).

Figure 4. Baffle Assembly

A. Carriage Bolts,

5/16-18 x 5/8

B. Carriage Bolt,

5/16-18 x 5/8

C. Carriage Bolts,

5/16-18 x 5/8

D. Carriage Bolts,

5/16-18 x 5/8

E. Locknut, 5/16-18
F. Right Hand Baffle
G. Left Hand Baffle
H. Discharge Chute

E

A

F

E

E

C

E

E

D

B

G

H

“A”

44” Mower Deck

50” Mower Deck

“A”

RH side 26-1/4” long

RH side 29-3/4” long

“B”

LH side 24-7/8” long

LH side 27-3/4” long

“B”

Advertising
This manual is related to the following products: