1 procedure – Siemens Simantic Net NCM for Industrial Ethernet S7 User Manual

Page 84

Advertising
background image

Configuring Communication Connections

84

SIMATIC NET NCM S7 for Industrial Ethernet

C79000-G8976-C129–06

4.1

Procedure

Steps

The following steps are necessary to operate connections on the SIMATIC S7 PLC
with the Ethernet CP:

Program the
SEND/RECEIVE interface in
the user program.

(Refer to Section 3.2 and the
detailed FC description in
Chapter 5).

Programming

Create new
connections

If necessary,
configure “Other
Station” for
connections using the
appropriate tool.

Download connection configurations
to the CP

Configure connection
properties.

Configuring

necessary steps

optional steps

Figure 4-1

Operating Connections with the Ethernet CP

Advertising