Maintenance chart – Solo USA MS 270 User Manual

Page 58

Advertising
background image

57

MS 270, MS 270 C, MS 280, MS 280 C

English / USA

1) STIHL recommends that this work

be done by a STIHL servicing dealer

2) see "Chain brake"

Maintenance Chart

Please note that the following maintenance intervals apply for normal
operating conditions only. If your daily working time is longer than normal or
cutting conditions are difficult (very dusty work area, resin-rich wood,
tropical wood etc.), shorten the specified intervals accordingly. If you only
use the saw occasionally, extend the intervals accordingly.

bef

ore

st

art

ing work

af

ter f

inishing

w

ork or

d

a

ily

af

te

r each

ref

uelin

g st

op

we

e

kl

y

m

ont

hly

e

ver

y 12

m

on

ths

if pro

b

lem

if dama

ged

as re

quire

d

Complete machine

Visual inspection (condition, leaks)

X

X

Clean

X

Throttle trigger, trigger interlock, Master
Control

Check operation

X

X

Chain brake

Check operation

X

X

Have checked by servicing dealer

1)2)

X

Pickup body/filter in fuel tank

Check

X

Clean, replace filter element

X

X

Replace pickup body

X

X

X

Fuel tank

Clean

X

Chain oil tank

Clean

X

Chain lubrication

Check

X

Saw chain

Inspect, also check sharpness

X

X

Check chain tension

X

X

Sharpen

X

Guide bar

Check (wear, damage)

X

Clean and turn over

X

Deburr

X

Replace

X

X

Chain sprocket

Check

X

Air filter

Clean

X

X

Replace

X

AV elements (rubber buffers, springs)

Inspect

X

X

Have replaced by servicing dealer

1)

X

Cooling inlets

Clean

X

Cylinder fins

Clean

X

X

Advertising
This manual is related to the following products:

280