Initial setup & assembly – Snapper 1693755 User Manual

Page 16

Advertising
background image

15

Initial Setup & Assembly

Figure 21. Underside of Left Footrest.
A. Carriage Bolt, Lockwasher, & Nut
B. Pedal Plate

Figure 22. Control Rod Support
A. Support
B. 5/16-18 x 1-1/4 Carriage Bolts
C. 5/16 Lockwashers & Nuts

A

B

Install Angling Control Rod

NOTE: If installing the dozer attachment on a unit
equipped with a snowcab, replace the control rod sup-
port (A, Figure 22) with the hanging support (Ref. No. 41,
Figure 8). Mount the hanging support to the front cab
cross-bar.

1. Remove and discard the two rear nuts, lockwashers,

and carriage bolts (A, Figure 21) securing the back of
the foot pedal plate (B).

2. Using the foot pedal plate (B) as a guide, drill two

5/16” holes up through the foot pedal pad.

3. Set the angling control support (A, Figure 22) on the

foot rest pad. Insert two 5/16-18 x 1-1/4 carriage
bolts (B) through the support, footrest pad, footrest,
and foot pedal plate. Secure using new lockwashers
and nuts (C).

4. Connect the lower angling rod (F, Figure 23) to the

dozer release lever using a hair pin clip and washer
(G).

5. Insert the upper control rod (C) through the eyelet

(B), and secure the eyelet to the support using a 1/4-
20 nylock nut (A).

NOTE: It may be necessary to leave the eyelet nut (A,
Figure 23) loose to prevent binding.

6 Secure the upper rod (C) to the lower rod (F) using

two 5/16-18 x 1-1/4 capscrews (D), washers (qty. 4),
lockwashers, and nuts (E). NOTE: Match offset to
offset so the rods form a straight line.

A

B

C

Figure 23. Assemble Control Rods
A. 1/4-20 Nylock Nut
B. Eyelet
C. Upper Control Rod
D. 5/16-18 x 1-1/4 Capscrew
E. 5/16 Washers, Lockwashers, & Nuts
F. Lower Control Rod
G. Hair Pin Clip & Washer

A

B

C

D

F

G

E

Advertising
This manual is related to the following products: