Installation method, Outdoor unit, Installation procedures – Samsung APC3240C User Manual

Page 28: When using the anchor bolt, Caution

Advertising
background image

E-

28

INSTALLATION METHOD

660mm (26")

335mm (

13

)

16

3 "

Anchor bolt fixing dimensions

Outdoor Unit

When using the anchor bolt

1. Fix the unit on a flat, rigid floor using the anchor bolt.

(Anchor bolt : M10 x 4 points - separately purchased)

Installation Procedures

1. Open the front panel, and remove the flare nut.

2. Bend the connection pipe to an appropriate length using the spring bender depending

upon the installation place.

- Allowable pipe length : Maximum 25m(82ft)
- Allowable pipe drop distance : Maximum 15m(49ft)
- Make no more than ten bending points on the pipe

When the pipe length is in excess of the standard pipe length of 5m(16 ft), add the refrigerant

(R-22) of 40g for each additional 1m(3 ft).

CAUTION

If the pipe is lengthened, the performance of the unit is degraded, and the service life is shortened.

Therefore, the pipe length should be as short as possible (less than 15m(49ft)).

Less than 15m(49ft)

Less than 15m(49ft)

Outdoor unit

Indoor unit

Indoor unit

Outdoor unit

1

4

3

8

Advertising