Check and test operation, Check – Samsung APC3240C User Manual

Page 34

Advertising
background image

E-

34

CHECK AND TEST OPERATION

Check

Be sure to check the following again after completion of installation.

1. Check the piping connection area for any gas leakage.

2. Is the drain hose properly connected?

3. Is the insulation of the piping in good condition?

4. Is grounding properly made?

Outdoor

connection area

Indoor
connection area

16

13"

30cm( 11 )

Insulation

Advertising