Installing the switch, Equipment checklist, Selecting a site – SMC Networks SMC-EZ109DT User Manual
Page 17: Equipment checklist selecting a site, Nstalling, Witch
I
NSTALLING
THE
S
WITCH
5
I
NSTALLING
THE
S
WITCH
Equipment Checklist
After unpacking the EZ Switch 10/100, check the contents of the
box to be sure you have received the following components:
•
EZ Switch 10/100 SMC-EZ109DT
•
Appropriate AC power cable
• Four adhesive foot pads & rackmount kit
•
SMC Warranty Registration Card
•
This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when
choosing a location:
Select a suitable location for the switch:
•
It should be accessible for installing, cabling and
maintaining the switch.
•
The temperature and humidity should be within the ranges
listed in the specifications.
•
The status LEDs should be clearly visible.
•
There should be adequate space (approximately two
inches) on all sides for proper air flow.
Make sure twisted-pair cable is always routed away from
power lines, fluorescent lighting fixtures and other sources of
electrical interference such as radios and transmitters.