Kobe Range Hoods CH2230SQ User Manual

Page 12

Advertising
background image

10

STAND ALONE INSTALLATION – TOP VENT

***This installation only applied with the purchase of a duct cover (Model No. CH1120DC).

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE

VENT OPENING.

- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.

- A straight, short venting run will allow the hood to perform more efficiently.

- Try to avoid as many transitions, elbows, and long run as possible. This may reduce

the performance of the hood.

- Use duct tape to seal the joints between pipe sections.

- If necessary, prepare back wall frame with cross framing lumber for secure installation.

- Using references on Table 2 and measurements on page 21-22, decide the level of the

lumber. Refer to Figure 14.

Hood Preparation before Installation

- Temporarily wire the hood to test for proper operation before installing.

- Peel protective film off the hood and the duct cover (if any).

- Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.

Figure 13 Figure 14

Figure 15

6” Round Vent 7” Round Vent 3-1/4” x 10” Vent

Advertising