Kalorik USK CCG080626 User Manual

Page 12

Advertising
background image



Copies of the I/B. Please reproduce them without any
changes except under special instruction from Team
International BELGIUM. The pages must be reproduced and
folded in order to obtain a booklet A5 (+/- 148.5 mm width x
210 mm height). When folding, make sure you keep the good
numbering when you turn the pages of the I/B. Don’t change
the page numbering. Keep the language integrity.

Fax +32 2 359 95 50

• To check or to modify the programming time, press the PROG

button twice until TIMER appears and it will be displayed. You can
now modify it as you like.

• When your appliance will start at the set time, the green pilot light

will go out and the red ON/OFF pilot light will come on, indicating
that the brewing process has started.

• You can switch off your appliance anytime simply by pressing the

ON/OFF switch until all pilot lights are off.
When you remove the jug from the appliance, a non-drip valve
will automatically operate to stop any drops of coffee dripping
onto the hotplate. Replacement of the jug automatically opens
the non-drip valve and allows remaining coffee to filter trough
into the jug.

• Once the water tank is empty, we advise you to wait until the

brewing process is finished and the filter has run empty before
removing the jug.

12

USK CCG 19322 - 080626

Assembly page 12/32






Advertising
This manual is related to the following products: