Wall mount installation – top vent – Kobe Range Hoods CH7948SQB User Manual

Page 13

Advertising
background image

11

WALL MOUNT INSTALLATION – TOP VENT



***This installation only applied with the purchase of a duct cover.

-

Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE

VENT OPENING.

-

A straight, short venting run will allow the hood to perform more efficiently.

-

Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.

-

Use duct tape to seal the joints between pipe sections.

-

If necessary, prepare back wall frame with cross framing lumber for secure installation.

-

Using references on Table 2 and measurements on Page 22-23, decide the level of the
lumber. Refer to Figure 14.

-

Temporarily wire the hood to test for proper operation before installing.

Hood Preparation before Installation

-

Peel protective film off the hood and the duct cover (if any).

-

Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.











Figure 13 Figure 14

6" Round Vent 7" Round Vent 3-1/4" x 10" Vent


Figure 15

Advertising
This manual is related to the following products: