Kobe Range Hoods CH7948SQB User Manual

Page 17

Advertising
background image

15

-

If necessary, attach two rubber stands (provided) with two (4x8 mm)

screws (provided) to

the back of the hood.

-

Attach the hood-mounting bracket to the back of the hood with nine (3/16" x 3/8") screws
(provided) as shown in Figure 25.

1.

Using references on Table 2 and measurements on Page 22-23, mark the leveling point
of the hood. Position two mounting screws (not provided) on the wall, leaving 1/8” away
from the wall as shown in Figure 26.

Hood Installation

CAUTION: If required to move the cooking range to install the hood, turn OFF the power on an
electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE.










Figure 25 Figure 26

2.

Use aluminum or steel pipe to connect the exhaust opening at the rear of the hood to the
ductwork. Use duct tape to make all joints secure and air tight.

3.

Align hood-mounting bracket to the two screws on the wall and hook hood into place.
Tighten screws to secure hood to the wall. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.

















Mounting
Screws

Advertising
This manual is related to the following products: