Kohler Discovery User Manual

Page 18

Advertising
background image

18

3.6 To assist in marking the positions of

the fixing holes, reverse the shower
valve and fit the building in shroud
through the cutout in the front of the
panel. Mark the positions of the M5
fixing holes in the two top brackets
only.
Important! Make sure that the correct
holes are used (refer to illustration).
Warning! Do not drill any holes for
the bottom securing bracket.

3.7 Drill the two 5 mm holes for the fixings

(countersink the holes at the front).

3.8 Remove the building-in shroud (retain

the screws for later use).

3.9 Secure the shower valve (positioned

from the rear of the panel) with the
M5 x 40 mm fixing screws (refer to
illustration).

3.10Fit the hot and cold supply pipes and

tighten the compression nuts.
Caution! Make sure that the olives are
fitted and all pipework is flushed
through before connecting to the
shower control.

3.11Fit the outlet pipework, leaving enough

pipe through the wall to temporarily cap
off.

3.12Turn on the water supplies and check

for leaks.

3.13Fit the shower fittings, refer to your

fittings installation and user guide for
instructions.

3.14Fit the concealing plate and control

assembly, refer to section: ‘Control
Assembly’
.

Securing Screws

M5 Fixing
Holes

Warning! Do not
drill or screw here.

Advertising