Caution : install heating lamps last – Kobe Range Hoods CH0042SQB User Manual

Page 14

Advertising
background image

11

Duct Cover Installation

5. Use 8” round steel pipe (follow building codes in

your area) to connect the ducting transition on
the hood to the ductwork above.

Use duct tape

to make all joints secure and air tight.

Refer

Figure 15. Slide the duct cover onto the hood.

6. Use 3/16” x 3/8” screws (included) to attach duct

cover to hood.











Figure 15

Final Assembly

CAUTION

: Install heating lamps last.

7. Drop oil tunnel into recess support near rear of

hood. Refer to Figure 16.

8. Install baffle filters and stainless spacer(s).

Refer to Measurements and Diagrams on page
21 for baffle filter and stainless spacer placement.
Angle baffle filter toward back of hood

. Push

baffle filter up until almost level . Slide forward
into recess behind the front of hood

. Lower

baffle filter

. Slide back until it fits into resting

position .Angle baffle filter toward back of hood

. Refer to Figure 17.

9. Repeat for all baffle filters and spacers.

10. Install heating lamps (not included), 120 Volts

175 Watts max. each.

11. Turn power ON in control panel. Check all

lights and fan operation.

12. Make sure to leave this manual for the

homeowner.


Figure 16




















Figure 17

Advertising
This manual is related to the following products: