Under the cabinet installation – Kobe Range Hoods CH9130SQB User Manual

Page 8

Advertising
background image

6

UNDER THE CABINET INSTALLATION

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD,

PREVENT

DEBRIS

FROM

ENTERING THE VENT OPENING.

Decide the location of the venting pipe

from the hood to the outside. Refer to

Figure 1.

A straight, short venting run will allow

the hood to perform more efficiently.

Try to avoid as many transitions,

elbows, and long run as possible. This

may reduce the performance of the

hood.

Temporarily wire the hood to test for

proper operation before installing.

Important: Peel protective film off

the hood (if any).

For installing under the cabinet with

recessed bottom, attach 4-inch wide

wood filler strips (not included) on each

side. Refer to Figure 2.

Measure and create access opening for

electrical wires and 6” round plastic

exhaust under the cabinet.

Hood Installation

CAUTION: If required to move the cooking

range to install the hood, turn off the power

on an electric range at the main electrical

box. SHUT OFF THE GAS BEFORE MOVING

A GAS RANGE.

1.

Puncture the knockout holes on the hood

as shown in Figure 3.

2.

Using references on Table 1 and

measurements on page 14 center the

hood in place beneath the cabinet and

flush with the front of the cabinet.

3.

Draw electrical wires through cabinet

access opening.

4.

From the bottom of the hood, place screw

(not provided) into the exact center of

each knockout hole. Make sure all screws

are in place before tightening screws.

CAUTION: MAKE

SURE THE HOOD IS SECURE BEFORE

RELEASING.

Figure 1

Figure 2

.

Figure 3

Figure 4

Advertising
This manual is related to the following products: