Unpacking and installation, Unpacking, Installation – LevelOne GSW-1675T User Manual

Page 15

Advertising
background image

9

UNPACKING AND INSTALLATION

This chapter provides unpacking and installation information for
GSW-1675T.

Unpacking

Open the shipping cartons of GSW-1675T and carefully unpacks its
contents. The carton should contain the following items:

One 16-Port 10/100/1000Mbps Gigabit Ethernet Web Smart

Switch

One AC power cord, suitable for your area’s electrical

power connections

Four rubber feet to be used for shock cushioning
Screws and two mounting brackets
CD-Rom with Web Management Utility and User’s Guide

If any item is found missing or damaged, please contact your local
reseller for replacement.

Installation

The site where you install the hub stack may greatly affect its
performance. When installing, consider the following pointers:

Install GSW-1675T in a fairly cool and dry place. See Technical
Specifications for the acceptable temperature and humidity operating
ranges.

Install GSW-1675T in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.

Advertising