Sidewall direct venting, Vent/air termination – sidewall, Model kit number vent size – Lochinvar SYNC 1.0 User Manual

Page 19

Advertising
background image

Installation & Operation Manual

3

Sidewall direct venting

Vent/air termination – sidewall

Follow instructions below when
determining vent location to avoid
possibility of severe personal injury, death,
or substantial property damage.

A gas vent extending through an exterior
wall shall not terminate adjacent to a wall
or below building extensions such as eaves,
parapets, balconies, or decks. Failure to
comply could result in severe personal
injury, death, or substantial property
damage.

Installation must comply with local
requirements and with the National Fuel
Gas Code, ANSI Z223.1 for U.S.
installations or CSA B149.1 or B149.2 for
Canadian installations.

Determine location

Locate the vent/air terminations using the following
guidelines:

1. The total length of piping for vent or air must not exceed

the limits given in the General Venting Section on page 18
of this manual.

2.

You must consider the surroundings when terminating
the vent and air:
a.

Position the vent termination where vapors will
not damage nearby shrubs, plants or air
conditioning equipment or be objectionable.

b.

The flue products will form a noticeable plume as
they condense in cold air. Avoid areas where the
plume could obstruct window views.

c.

Prevailing winds could cause freezing of condensate
and water/ice buildup where flue products impinge
on building surfaces or plants.

d.

Avoid possibility of accidental contact of flue
products with people or pets.

e.

Do not locate the terminations where wind eddies
could affect performance or cause recirculation,
such as inside building corners, near adjacent
buildings or surfaces, window wells, stairwells,
alcoves, courtyards, or other recessed areas.

ƽ WARNING

ƽ WARNING

NOTICE

ƽ WARNING Do not connect any other appliance to the

vent pipe or multiple boilers to a common
vent pipe. Failure to comply could result
in severe personal injury, death, or
substantial property damage.

TO BOILER

INTAKE AIR

CONNECTION

FROM BOILER

VENT PIPE

CONNECTION

VENT / AIR

TERMINATION

GRADE OR

SNOW LINE

12"

MIN

12"

MIN

TO

OVER-

HANG

POSSIBLE ORIENTATIONS

Figure 3-1A PVC/CPVC Sidewall Termination of Air and
Vent

f.

Do not terminate above any door or window.
Condensate can freeze, causing ice formations.

g.

Locate or guard vent to prevent condensate
damage to exterior finishes.

ƽ WARNING Sidewall vent and air inlet terminations

must terminate in the same pressure
zone.

Do not exceed the maximum lengths of the
outside vent piping shown in FIG.’s 3-1B and
3-1C. Excessive length exposed to the outside
could cause freezing of condensate in the
vent pipe, resulting in potential boiler
shutdown.

ƽ WARNING

If using the alternate sidewall termination:

3. The air piping must terminate in a down-turned elbow as

shown in FIG. 3-1B. This arrangement avoids recirculation
of flue products into the combustion air stream.

4. The vent piping must terminate in an elbow pointed

outward or away from the air inlet, as shown in FIG. 3-1B.

Figure 3-1B Alternate Sidewall Termination of Air and
Vent w/Field Supplied Fittings

Model

Kit Number

Vent Size

1.0 - 1.5

KIT30028

(Stainless Steel)

6 inch vent

1.3 - 1.5

KIT30029

(Stainless Steel)

7 inch vent

Table 3A Sidewall Vent Kits

19

Note: Available in 6"
diameter only.

Advertising