Dealer preparation check list, Single deck finishing mower fp-100 – Locke FP-172-C User Manual

Page 5

Advertising
background image

DEALER PREPARATION CHECK LIST

Single Deck Finishing Mower

FP-100

BEFORE DELIVERING MACHINE- The following check list should be

completed. Use the Operator’s Man-
ual as a guide.


1. Assembly completed.

2. Gearboxes filled with oil.

3. All fittings lubricated.

4. All shields in place and in good condition.

5.

All fasteners torqued to specifications given in Torque Chart.

6. All decals in place and readable. (See decal page.)

7. Overall condition good (i.e. paint, welds)

8. Operators manual has been delivered to owner and he has been instructed on the
safe and proper use of the mower.








Dealer’s Signature______________________________________________________

Purchaser’s Signature___________________________________________________




THIS CHECKLIST IS TO REMAIN IN OWNER’S MANUAL

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

3

Advertising
This manual is related to the following products: