Before you start – Lucent Technologies LULCST User Manual

Page 7

Advertising
background image

Before You Start

Before installing your system, read and understand the safety instructions on
page ii (inside front cover). Be sure you have all the necessary parts, tools, and
test equipment, listed below.

1. Read important Safety Information on Page ii.
2. Check Shipping Container Contents.

n

Call Stacker Unit

n

Mounting Hardware (screws and brackets)

n

Power Cord

n

This Installation and Use Guide

3. Have Required Tools
The following tools are required for the installation of the hardware and cabling.

n

Phillips screwdriver (small and large)

n

Standard blade screwdriver (small and large)

n

Wire strippers (24 AWG - 12 AWG)

n

Telephone test set

n

Tone out circuit tester (optional, for troubleshooting)

n

Volt-ohm Meter (optional, for troubleshooting)

n

4 wood screws, if mounted on wall

4. Verify Interface Compatibility with Telephone System and Paging System (see
Table 1-1 on the next page).

Overview 1-3

Advertising