0 installation, Step 1 -- unpacking the items – Lightwave Communications USB SuperSwitch User Manual

Page 18

Advertising
background image

Lightwave Communications

USB

S

ERVER

S

WITCH

Page 18 of 25

December 2001

5.0 Installation

The USB ServerSwitch unit is designed to occupy 1 RU (1.75 inches) of rack
space. Sufficient space is required behind the rear panel of the unit to allow for
attached cables bend radius (6 inches should be sufficient). It is helpful to plan
ahead if additional units might be added to the configuration at some later date. If
cascading (adding USB ServerSwitches) is to be used, make certain to leave
enough space in the rack for additional units. The USB ServerSwitch installation
can be expanded at any time, without interfering with servers connected to existing
switches.

Figure 5: USB ServerSwitch – Front and Rear panels

STEP 1 -- Unpacking the Items

Verify that the following items are located in the packaging.

(1) USB ServerSwitch

(1) AC Power Cordset

(1) Cable - DB9 Female to Male Serial data cable (6 foot long)

(1) USB ServerSwitch Product Handbook

Cables, as required for your number of servers and units

NOTE! Optional cable kits are available. (1) Kit contains:

(1) USB-A to USB-B cable, to connect a server's keyboard and mouse to

the USB ServerSwitch

(1) HD15 male-male video cable to connect server video adapter to the

USB ServerSwitch

Cascade kit includes two HD15 male-male cables. The DB9 male-to-

female cable required is shipped with the USB ServerSwitch

NOTE! Other items may be ordered or shipped separately.

Advertising