Grounding diagram and procedure – Paradyne 4300 User Manual

Page 15

Advertising
background image

4300 Remote Broadband Access Concentrator Installation Instructions

GROUNDING DIAGRAM AND PROCEDURE

Internal Grounding bus

Ground Rods

Front view of cabinet with
door open

Figure H - Grounding Diagram

To ground the cabinet, see Figure H above.

1. Drive the ground rods into the ground near the cabinet location.

2. Use a Megger-type ohmmeter to measure the resistance between cabinet ground and the ground rod. The

resistance must be 25 ohms or less.

3. If the resistance requirement in Step 2 is met, proceed to step 4. Otherwise, follow local practices to lower

the resistance to ground.

4. Connect a #6 ground wire to the ground rod.

4300-A2-GZ40-00 July 2004 15

Advertising