Step 2: Mounting VTrak Unit in a Rack

5

Step 2: Mounting VTrak Unit in a Rack

VTrak J610s

The J610s subsystem installs to the rack using the supplied mounting rails. You
can also use your existing rails.

Figure 5. VTrak J610s mounted in a rack with the supplied rails

To install the J610s subsystem into a rack with the supplied mounting rails:
1.

Check the fit of the mounting rails in your rack system. See Figure 6.

2.

Adjust the length of the mounting rails as needed.

Cautions

At least two persons are required to safely lift, place, and
attach the VTrak subsystem into a rack system.

Do not lift or move the VTrak subsystem by the handles,
power supplies or the controller units. Hold the subsystem
itself.

Do not install the VTrak subsystem into a rack without rails to
support the subsystem.

Only a qualified electrician who is familiar with the installation
procedure should mount and install the VTrak subsystem.

Be sure all switches are OFF before installing the VTrak
subsystem or exchanging components.

Vertical Rack Post

VTrak J610s

Mounting rails (included)

mount outside the rack post

Handles mount

outside the rack post