Patton electronic ONSITE 2800 User Manual

Page 5

Advertising
background image

5

OnSite 2800 Series User Manual

Table of Contents

Installing the T1/E1 twisted pair cables

..............................................................................................34

Installing the E1 dual coaxial cables

....................................................................................................35

Connecting to external power source

.........................................................................................................36

3

Getting started with the OnSite Managed VPN Router

................................................................................ 38

Introduction

..........................................................................................................................................................39

1. Configure IP address

.........................................................................................................................................40

Power connection and default configuration

...................................................................................................40

Connect with the serial interface

.....................................................................................................................40

Login

..............................................................................................................................................................41

Changing the IP address

.................................................................................................................................41

2. Connect the OnSite VPN Router to the network

..............................................................................................42

3. Load configuration

............................................................................................................................................42

4

Serial port configuration

............................................................................................................................... 44

Introduction

..........................................................................................................................................................45

Serial port configuration task list

...........................................................................................................................45

Disabling an interface

.....................................................................................................................................45

Enabling an interface

......................................................................................................................................46

Configuring the encapsulation for Frame Relay

..............................................................................................47

Enter Frame Relay mode

.................................................................................................................................48

Configuring the LMI type

...............................................................................................................................48

Configuring the keep-alive interval

.................................................................................................................49

Entering Frame Relay PVC configuration mode

.............................................................................................49

Configuring the PVC encapsulation type

........................................................................................................50

Binding the Frame Relay PVC to IP interface

.................................................................................................50

Enabling a Frame Relay PVC

..........................................................................................................................52

Disabling a Frame Relay PVC

.........................................................................................................................52

Displaying serial port information

...................................................................................................................53

Displaying Frame Relay information

...............................................................................................................54

Integrated service access

..................................................................................................................................55

5

T1/E1 port configuration

.............................................................................................................................. 58

Introduction

..........................................................................................................................................................59

T1/E1 port configuration task list

..........................................................................................................................59

Enable/Disable T1/E1 port

.............................................................................................................................59

Configuring T1/E1 port-type

..........................................................................................................................60

Configuring T1/E1 clock-mode

......................................................................................................................60

Configuring T1/E1 line-code

..........................................................................................................................60

Configuring T1/E1 framing

............................................................................................................................61

Configuring T1/E1 line-build-out (T1 only)

..................................................................................................61

Configuring T1/E1 used-connector (E1 only)

.................................................................................................61

Configuring T1/E1 application mode

.............................................................................................................62

Configuring T1/E1 LOS threshold

.................................................................................................................62

Configuring T1/E1 encapsulation

...................................................................................................................62

Create a Channel-Group

.................................................................................................................................62

Advertising