Operation, Warning – Powermate CYCLONE P-WB-163150-[E] User Manual

Page 11

Advertising
background image

Questions? Call Toll Free at 1-800-737-2112

Copyright © 2009 MAT Engine Technologies, LLC

Operation

(Continued)

• Save all instructions

How to Stop the Blower

C

Move the ON/OFF Switch to the OFF position. (See figure 6)

How to Adjust the Vertical Flow Angle

D

The vertical air flow direction can be adjusted between

3 positions: Straight (level), 15 degrees upward, and 15

degrees downward. Refer to Figure 8 when performing the

adjustment steps below:

1. Stop the engine.

2. Pull the index lever out of its existing hole.

3. Rotate the index lever to the desired position.

4. Release the index lever and allow it to insert into the

desired hole.

WARNING

Never adjust the flow angle when engine is running. Never

stand or put your hand in front of the discharge opening

when the engine is running. Never put hands, fingers, or

anything else inside the discharge opening when the engine

is running. There are rotating blades inside which can cause

serious injury.

How to Redirect Air Flow toward the Front

E

A Front Flow Attachment is included with your blower. Assembling this attachment to the blower will cause the air flow to

be redirected to the front of the blower.

Adjustment

Lever

Level

15° Upward

Air Flow

Louver

10

To assemble this attachment to the blower, follow the steps

below and refer to Figure 9:

1. Stop the engine.

2. Rotate the vertical adjustment lever to the level position

(See Figure 8)

3. Loosen the attachment knob located on top of the blower

discharge chute

4. Orient the attachment so the “This Side Up For USE” is up.

5. Slide the front flow attachment over the discharge

chute with the orientation identified on the label. The slot

on the top of the front flow attachment will mate

with the bolt of the attachment knob.

6. Hand-tighten the attachment knob to secure the

attachment.

Note:

when properly assembled, the attachment knob will fit

inside of the round emboss on the top of the attachment.

15° Downward

Discharge

Chute

Bolt

Round

Emboss

Slot

Attachment

Knob

Front Flow

Attachment

Figure 8

Figure 9

Advertising
This manual is related to the following products: