Light Direct Connect Fitting Installation Guide

9

Installing the Light Direct Connect Fitting

Using Red Brass Conduit

1.

Remove one 3/4” knockout from the load center for the 1/2” for red
brass conduit.

2.

Position the LOCK NUT over the load center knockout opening to
align the lock nut and knockout opening.

3.

While holding the lock nut in place, insert the BUSHING through the
knockout and into the lock nut thread. Hand tighten the bushing into
the lock nut.

4.

Using a 1” pipe wrench, tighten the bushing to secure in place. (If
required, untighten the ground terminal screw and orient the
terminal to a horizontal position.

5

.

Pull the LIGHT POWER CORD up through the 1/2” Red Brass (NPT)
conduit.

6.

Route the light cord up through the bushing and lock nut into the
load center. Leave enough cord and ground wire slack for
connections to the load center relay.

Continue on next page.

LOCK NUT

LOAD CENTER
KNOCKOUT

BUSHING

LIGHT
POWER
CORD

RED BRASS (NPT)

1/2” CONDUIT

LOCK NUT AND

BUSHING

LIGHT POWER CORD

NOTE: BONDING
TERMINAL IS NOT
USED