Water connections, Quick-flange installation instructions – Pentair spa heater User Manual

Page 15

Advertising
background image

Rev. E 2-7-01

P/N 471048

15

Installation (contd.)

WATER CONNECTIONS

QUICK-FLANGE INSTALLATION INSTRUCTIONS

Each MiniMax Plus Quick-Flange Accessory Kit contains the following items:

One (1) Quick-Flange unit

Two (2) 2 in. Rubber gaskets

Four (4) 3/8 Bolts

Four (4) 3/8 in. Washers

Two (2) Plastic sleeves

FOR 1½ & 2 in. SCHEDULE 40 PVC PIPE

1. Insert plastic sleeves into the “Quick-Flange”

inlet/outlet openings.

2. Slip the 2 in. rubber gaskets over the plastic

sleeves.

3. Bolt the “Quick-Flange” to the header.

NOTE

Tighten the bolts evenly! Do not over tighten!

4. Use plumbers roll or medium grit sand paper and

clean the inlet/outlet openings of the “Quick-
Flange”. Use the same method to clean the 2 in.
PVC pipe. The sand paper will break up any
grease or contaminant that may not be cleaned
away with a primer.

5. Use 711 PVC glue (or equivalent) and follow the

manufacturer’s recommendations. Apply to the
inlet opening of the “Quick-Flange”. Do the
same to the PVC pipe and quickly insert the
pipe into the “Quick-Flange” and twist the pipe
a 1/4 turn. Do the same to the other opening of
the “Quick-Flange”.

6. For 1½ in. PVC pipe installations, first glue a 1½

in. X 2 in. sch 40 PVC bushing (not supplied or
shown) to the end of the pipe prior to gluing to
the “Quick-Flange”.

Figure 13.

NOTE

You “DO NOT” need the plastic bushings.

1. Insert pipe into the inlet/outlet openings of the

“Quick-Flange”

2. Slip the rubber gaskets over the pipe, using the

supplied 2 in. rubber gasket for 2 in. copper pipe
or the 1½ in. rubber gasket (not supplied,
available from the factory) for the 1½ in. copper
pipe.

3. Bolt the “Quick-Flange” to the header.

Figure 15.

FOR 1½ & 2 in. COPPER PIPE

Advertising