Indoor installations powermax venting guidelines, Air supply, Vent termination for side wall installations – Pentair spa heater User Manual

Page 31: Diagram 1)

Advertising
background image

Rev

. E 2-7-01

P/N 471048

3131

A-5

DIAGRAM 1)

Detail H

INDOOR INSTALLATIONS

POWERMAX VENTING GUIDELINES

,,

,,









vent terminated at
least 24" above
any object within 10 ft.

Vent
Cap

Ridge

Chimney

3 ft. min.

2 ft. min.

10 ft.

4'

7'

4'

Air Supply
Ventilation

Air Supply
Combustion

Vent Hood

Walkway

3'

1' min.

1' min.

1' min.
above grade

Vent Hood

Vent Hood

E

H

D

F

G

G

F

B

C

A

must extend at least 3 ft. higher than the
point at which it passes through the roof,
or as permitted by local code.

must use a double-wall vent pipe through
the roof penetration.

must terminate with an approved (listed)
roof jack, storm collar, and vent/weather cap.

must be not less than 7 ft. above public walkways.
must be at least 3 ft. above any outside air intake located within a 10 ft. radius.
must NOT be within 3 ft. of an inside corner of the structure.
must be at least 1 ft. above grade.

must be located the following distances away from any door, window, or gravity air inlet:

4 ft. below
4 ft. horizontally
1 ft. above

Air Supply

See Air Supply Requirements Tables.

B

A

D

E

F

J

K

L

C

G

Vent termination for side wall installations:

must be the same diameter as the
vent connector.

must be suitable for use with category III
appliances which have flue gas temperatures
of less than 400 deg. F.

may use a single wall vent pipe with
permanently sealed seams and joints.

Vent pipe extension:

Vent for roof penetration installations:

L

J

K

Recommended sources for
side wall Vent Hood; see page A-4,
Section Venting.

(Tables 10 and 11, on page 19.)

Advertising