Patterson-Kelley MOD-04 User Manual

Page 13

Advertising
background image

Modu-Fire

®

Gas-Fired Boiler

Installation

10

Gas Piping

Note: Install a sediment trap (drip leg) and a union
connection ahead of the primary manual shutoff valve

on the boiler. Gas piping should be installed in accor-
dance with National Fuel Gas Code, ANSI Z223.1,
latest edition, and any other local codes which may
apply; in Canada see CAN/CGA-B 149.

Note:
See chart below for required pipe size, based on
overall length of pipe from meter plus equivalent
length of all fittings. Approximate sizing may be based
on 1 cubic foot of natural gas per 1,000 Btu per hour
input, i.e., 900,000 Btu per hour requires about 900
cubic feet per hour. (See Typical Boiler Operating
Conditions, Section 4.3, for more information.)

WARNING!

All threaded connections must be made using a pipe
compound that is resistant to the action of liquefied
petroleum gases. Do not use Teflon tape on gas line
threads.


Pipe Capacity for Natural Gas

Equivalent Pipe Length

Maximum Capacity in Cubic Feet of Natural Gas per Hour

Pressure Drop of 0.5 inch Water Column/Equivalent Length of

Pipe (in feet)

Nominal

Iron

Pipe

Size

(Inches)

Internal

Diameter

(Inches)

90º Ell

(Feet)

Tee

(Feet)

20

40

60

80

100

150

200

1-1/4

1.380

3.45 6.9

950

1-1/2

1.610

4.02 8.04

1,460

990

810

2

2.067

5.17

10.3

2,750 1,900 1,520 1,300 1,150 950 800

2-1/2 2.469

6.16

12.3

4,350 3,000 2,400 2,050 1,850 1,500 1,280

3

3.068

7.67

15.3

7,700 5,300 4,300 3,700 3,250 2,650 2,280

4

4.026

10.1

20.2 15,800

10,900 8,800 7,500 6,700 5,500 4,600


By Installer

Remote Gas

Shutoff (not

supplied)

Drip Leg

Union

Shutoff (on

boiler)

Gas Meter (not
supplied)

Advertising