Testing procedure – Panasonic SR-GA721 User Manual

Page 10

Advertising
background image

10

SR-GA421/SR-GA281/SR-GA721

4. TESTING PROCEDURE

3. Boiling control lever adjustment

Such a mechanical operation as center thermostat goes up and down is used to turn on

and off the micro-switch. Check and adjust this relationship as shown below.

When the boiling switch is turned on. When the boiling switch is turned off.

Checking

The auxiliary lever presses the push-

button (The “WARM” lamp comes on.)

The auxiliary lever does not press

the push-button (The “COOK” lamp

comes on.)

Adjusting

To gain the above relationship, adjust the auxiliary lever by bending it with

long nose pliers.

Advertising
This manual is related to the following products: