Setting the pad pcb – Panasonic CF-30KTPAXxM User Manual

Page 50

Advertising
background image

9-27

9.2.11. Setting the PAD PCB

1. Fix

the

PAD

PCB

using

the

2

Screws

<N29>

(No1 to No2)

.

2. Attach the TP PCB Screw Sheet.
3. Connect the Cable to the Connector. (CN802)
4. Connect the Cable to the Connector (CN801) and attach

the Tape.

Note:

Tighten the Screws in the numbered order (No1 to No2).

Screws <N29>: DRQT26+E3FNL

Assembly of PAD PCB

Pad PCB

Connector

(CN802)

Connector

(CN801)

Tape

TP PCB Screw Sheet

<N29>

<N29>

No.1

No.2

<N29>

<N29>

No.1

No.2

7

䌾11

7

䌾11

0

㫧2

NG

OK

2

㫧1

CAUTION

S1:Insulation S2:Bitten S3:Sharp Edge
S4:Part No. Check S5:Other

1. Apply the load when attaching the attaching parts.

20 to 30N (2 to 3Kgf)/cm2

2. Reusing the attaching parts is prohibited.

Tightening torque

TAPE Attach
After inserting FFC, confirm
it is not diagonal insertion, and then
attach.(To prevent coming off)

Confirm it is not diagonal.

Example of NG

Insert into the boss at an angle to
put here close to the Cabinet side.

Avoid running over the top of boss

Ensure the wire does not
protrude from the top of
boss.

Confirm the
processed wire
View from A
direction

Insurate the Board
and Cabinet.

Avoid running
over the boss
and the rib.

When pressing not to touch
the Cabinet wall, be careful
not to bend

the FFC stiffening plate.

Process the surplus
of FFC to the back

TP INS SHEET
Attach

Process the wire
targeting the boss

Fix with Screws in order of the rear number of No.
Ex.) Fix in order of Screw-1 to Screw-2.

Remove the Release
Paper and process
the FPC

TAPE-2 Attach
Fit to the Cabinet line

Avoid catching the Cable in the Cabinet

TAPE
Attach

TAPE-1
Attach

CABLE HOLD
SHEET Set

View from
A direction

Process the SP Cable between the bosses.

Insert FFC

PWB PAD
Set

Insulate the Screw head

TP PCB Screw SHEET Attach
Match to the end of the Board

Tighten

Screw-2

Tighten

Screw-1

Torque of tightening Screw :0.45 ± 0.05N·m(

Ṑ4.5 ± 0.5kgf·cm)

S1

S1

S2

S2

S2

Line involved prevention
to the boss of the SP cable

PWB

䇭PAD

LED PWB

Advertising