Battery backup, Short-term option, Long-term option – NEC NEAX 2000 IPS User Manual

Page 64: Power failure transfer (pft), Pz-8pftb, Figure 5-1, Pz-8pftb installation, Table 5-3

Advertising
background image

NEAX 2000 IPS Configuration Guide

Page 54

NDA-24347, Issue 1

Battery Backup

Chapter 5 System Power Supply

Battery Backup

For customers requiring battery backup, short-term and/or long-term options are
available.

Short-term Option

Two 3.4AH batteries are required per PIM, and installed inside each PIM. Backup
time is approximately 30 minutes when PHS is not accommodated and approximately
ten minutes when PHS is accommodated in the system.

Long-term Option

Two 24AH batteries are required per each two PIMs, and installed inside the Battery
Module in each stack. Backup time is approximately three hours when PHS is not
accommodated and approximately two hours when PHS is accommodated in the
system.

The batteries vary depending on the requested backup time.

The battery is provided locally.

Power Failure Transfer (PFT)

PZ-8PFTB

Figure 5-1 PZ-8PFTB Installation

Table 5-3 PZ-8PFTB

ABBR.

NAME

CODE

PART

NUMBER

QTY

REMARKS

PFT

PZ-8PFTB

150119

1

per PIM

8-line PFT Card

PFT 1 CONNECTOR

CHAMP CONNECTOR ATTACHED TO PZ-8PFTB

25-PAIR CABLE

TO MDF

PFT 0 CONNECTOR

PZ-8PFTB

Advertising