Ab c – NETGEAR ReadyNAS 3200 User Manual

Page 17

Advertising
background image

ReadyNAS 3200 Hardware Manual

Getting Started

1-9

v1.1, July 2009

3. Fasten the backs of the outer rails to the rack with screws. Press the release to extend the rails.

Hang the hooks of the rails into the rack holes, and fasten the rails to the rack.

4. Extend the ball shuttle (A) to the very front. Align the rails (B) and push the chassis in.

Secure the handles to the outer rails (C) with screws. The rack mount installation is complete.

Figure 1-7

Figure 1-8

A

B

C

Advertising