Installation check list – Rheem AP13945-2 User Manual

Page 25

Advertising
background image

25

A. Water Heater Location

Close to area of vent termination.

Indoors and protected from freezing temperatures .

Proper clearance from combustible surfaces
observed.

Sufficient fresh air supply for proper operation of
water heater.

Air supply free of corrosive elements and
flammable vapors.

Provisions made to protect area from water
damage.

Sufficient room to service heater.

Combustible materials, such as clothing, cleaning
materials, rags, etc. clear of the heater and vent
piping.

Water heater is properly attached to the wall.

B. Water Supply

Water supply has sufficient pressure.

Air purged from water heater and piping.

Water connections tight and free of leaks

Water filter is clean and in place.

Materials used are as instructed in this manual.

Water pipes are insulated and protected from

freezing.

C. Gas Supply

Gas type matches rating plate.

Gas supply pressure is sufficient for the water
heater.

Gas line equipped with shut-off valve, union and
sediment trap.

Approved pipe joint compound used.

Soap and water solution used to check all
connections and fittings for possible gas leak.

Gas Company inspected installation (if required).

D. Relief Valve

Pressure Relief Valve properly installed and
discharge line run to open drain

Discharge line protected from freezing.

E. Venting

Vent pipe material should be category III and meet

UL1738 in US and ULC.636 in Canada.

Vent connector(s) pitched downward to termination
(¼" per foot of length minimum) See page 14.

Vent connector(s) securely fastened together with
high temperature silicone (500°F) (260°C) and air-
tight.

All vent runs are properly supported.

Vent terminal is properly installed.

Sufficient combustion air is available.

Maximum and minimum vent lengths are
observed.

F. Electrical Wiring

Voltage matches rating plate.

Water heater is properly grounded.

Supply cord and/or wiring meets all local codes.

G.

Air Intake Pipe

Connected to the air intake tee/vent termination
and heater.

All vent runs are properly supported.

Maximum and minimum vent lengths are
observed.

Connected securely together and airtight.

Installation Check List

Advertising