Roberts Gorden GordonRay BH-175 User Manual

Page 14

Advertising
background image

ROBERTS GORDON

®

BH- S

ERI E S

S

UBM IT TAL

S

HE E T

© 2004 Roberts-Gordon

BEFORE IN ST AL LATI ON AND OPER ATI ON OF HEATI NG E QUIPMENT, READ AND U NDERSTAND T HE INSTALL AT ION, OPERATIO N AND SERVICE MANUAL .
APPL ICATION S, ENGI NEE RING AND DET AI LE D GUID ANCE ON SYST EMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON

®

PRODUCT S ARE T O BE

INSTAL LE D ONL Y IN ACCORDANCE WI TH L OCAL L AWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.

Tube Clamp Package Installation

Coupling and Tube Assembly

Flat

Washer

Nut

(Torque 120 in/lb

13.56 Nm)

Tube Clamp

Bolt

Description

Part Number

Tube Clamp Package

01318901

Tube Clamp

01396801

Bolt

97113940

Flat Washer

95211600

Nut

92113900

Tube

Tube

Orient coupling so that

the impact block is in the

2:00 or 10:00 o’clock

positions

Closed

Open

Tab

3" (8 cm) to

4" (10 cm)

Slide Bar/Coupling Lock

Coupling

Wide end

Coupling

Tube

Slide Bar/Coupling Lock

A

Close coupling
with tab

B

Start Slide bar/Coupling Lock
onto coupling

C

Insert tubes into coupling

D

Tighten coupling to join tubes

Descr ipti on

Part Number

Coupling

01329600

Slide bar/Coupling Lock

01329700

Tube

91409XXX

Advertising
This manual is related to the following products: