Raypak 240692 User Manual

Page 14

Advertising
background image

INSTALLATION VERIFICATION PROCEDURE

REGISTER

Before proceeding any further, please verify that the user registration form has been completed and mailed.

MECHANICAL INSTALLATION

Verify that the mechanical installation has been completed in accordance with the instructions.

OUTDOOR AIR TEMPERATURE SENSOR

Verify that all Outdoor Air Temperature Sensor installation parameters have been met.

WATER TEMPERATURE SENSOR

Verify that the Water Temperature Sensor installation parameters have been met.

SYSTEM MODULE INSTALLATION

Verify electrical power wiring connections.

Verify electrical connection torque requirements.

Verify Outdoor Air Temperature Sensor wiring.

Verify Water Temperature Sensor wiring.

Verify Power Test has been completed successfully.

POWER TEST

Utilizing a Volt-Ohm-Meter (VOM) monitor the following on the controller for proper voltage levels. Check at
Terminal Block TB-1.

POWER TEST TABLE

From:

To:

Indication

TB pin 1

TB pin 2

108 VAC to 132 VAC

TB pin 1

Single Point Ground

108 VAC to 132 VAC

TB pin 2

Single Point Ground

less than 1 VAC

14

Advertising