2 hauling the tractor and implement, Hauling the tractor and implement -37, Operation – Rhino Mounts BOOM ARM MOWER DB150 User Manual

Page 143: Opera t ion

Advertising
background image

OPERATION

DB150 07/11

Operation Section 4-37

© 2011 Alamo Group Inc.

OPERA

T

ION

12.2 Hauling the Tractor and Implement

Before transporting a loaded tractor and implement,
measure the height and width dimensions and
gross weight of the complete loaded unit. Ensure
that the load will be in compliance with the legal
limits set for the areas that will be traveled through.
OPS-U- 0024_TK

Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer. OPS-U- 0025

Advertising