Service of spindle housing, Removing bearing, Inspection – Rhino Mounts BOOM ARM MOWER DB150 User Manual

Page 172: Maintenance

Advertising
background image

MAINTENANCE

DB150 07/11

Maintenance Section 5-20

©2011 Alamo Group Inc.

MAINTENANCE

SERVICE OF SPINDLE HOUSING

(FIGURE Mnt-0006)

Remove blade bar or pan.

Remove hydraulic motor.

Remove spindle housing from unit.

Drain remaining oil from housing.

Using a chisel, bend the tang on the lockwasher (6)
until it is free from the slot in the nut (5).

Unscrew locknut and remove locknut and
lockwasher, and second locknut.

The Spindle should now slide from the Spindle
housing, so the Spindle can be removed from the
Housing.

Remove the Seal (7) from the Housing

Removing Bearing

If replacing bearings:

Remove the old bearings from the Spindle and Housing. Be careful not to damage either the Spindle or
Housing in this process.

Turn the spindle housing over and from the bottom side of the spindle housing, using a punch, drive the
remaining bearing cup out.

Clean spindle housing, spindle and bearings thoroughly.

When rebuilding the spindle housing assembly, always replace the locknuts, lockwasher, and seal.

Inspection

Bearing and cups:

Inspect bearings and bearing cups for nicks, pitting, discoloration and wear. If any exist, replace bearing and
bearing cup.

Advertising