Installer guide – Russound UNO S2 User Manual

Page 13

Advertising
background image

INSTALLER GUIDE

UNO-S2 Keypad Location

13

The best infrared remote performance is

achieved with the keypad installed away

from any direct sunlight, plasma TV, and low

voltage lighting controls. Also consider con-

venience when choosing a location.

Choose a place that is easily seen from

the position where a person is most likely

to be located.

Check whether or not you can route the

wire to the location you have chosen.

Keypad Installation

To install a double-gang keypad, you will

need to use a UL/CSA approved plastic

double-gang electrical box.

Route CAT-5 wire to the junction box from

the CAV6.6.

Use the supplied 110 punchdown tool to

connect each wire to its corresponding

color labeled on the punchdown terminal

(See page 12 for details).

Ensure jumper setting on the keypad is in

the “RUN” position.

Mount the keypad in the electrical box and

attach the cover plate. Repeat the steps

until all keypads are installed.

Advertising