Drilling template – Optima Company 1001 User Manual

Page 14

Advertising
background image

1001

14

Important Note - Always use two spanners to prevent twisting of soft copper pipework on the boiler.

Flush out the water system.

Note - The maximum inlet cold water pressure must not exceed 10 bar (145 P.S.I.) and a water governor or a pressure
reducing valve will be required if the pressure is in excess of 5 bar (72 P.S.I.).

Ensure all pipework is adequately supported.

Drilling template

2 Gas 22 mm

3 Domestic Hot Water
outlet 15 mm

5 Outlet central heating
safety valve 15 mm

4 Domestic Cold Water inlet 15 mm
6 Central Heating flow outlet 22 mm
7 Central Heating return inlet 22 mm

Important Note - Always use two spanners to prevent twisting of soft copper pipework.

Note - The central heating safety valve (5) should be piped 15 mm to discharge safely outside the property.

Fig. 10

1 = Electrical cable entry
2 = Gas supply
3 = Domestic Hot Water outlet
4 = Domestic Cold Water Inlet
5 = Outlet Central Heating safety valve
6 = Central Heating flow outlet
7 = Central Heating return inlet

2

= 22 mm

3-4-5 = 15 mm
6-7

= 22 mm

Fig. 11

Side flue outlet
Diam. min. 118 mm

Fixing stud

boiler

Upper bracket

Rear flue outlet
Diam. min. 118 mm

Boiler = 480 mm

Lower bracket

Advertising