Quadra-Fire 31ST-ACC User Manual

Page 37

Advertising
background image

July 7, 2011

7033-277I

Page 37

3100 Wood Stove Series (ACC)

R

G. Tube Channel Assembly Replacement

Removing Tube Channel Assembly

1. Remove the right side shield by removing 2 screws in the

back using a Phillips head screw driver.

2. Remove 4 screws from channel access cover and remove

cover.

3. Locate 2 channel nuts inside of chamber and remove

using a 7/16 socket wrench. Slide out tube channel
assembly.

NOTE:

Soak the bolts with penetrating oil for at least 15

minutes before trying to remove them.

Replacing Tube Channel Assembly

1. Slide one gasket onto each tube.

2. Slide the tube channel assembly into side of fi rebox and

insert each tube into the corresponding hole in the tube
channel rack starting with the back hole fi rst.

3. Make sure tube channel assembly is fl ush against the

side of the stove and secure with channel nuts.

4. Re-install channel cover and side shield.

Channel
Access
Cover

Channel
Nuts (2)

Side Panel

Tube Channel
Assembly

Channel Cover
Screws (4)

Tube Channel Rack

Remove
2 Screws

Slide one gasket
over each tube

Figure 37.1

NOTE: Service Space

In order to replace the tube channel assembly a clearance
of 19 inches (483mm) is required on the right side of stove
in order to remove the tubes with the stove in place.

If space is not available, the stove will have to be discon-
nected from the chimney to proceed with the tube replace-
ment.

Advertising
This manual is related to the following products: