Telular SX5D User Manual

Page 12

Advertising
background image

Phonecell

®

SX5 GSM

5

User Manual

4. Mark two hole locations 83 mm (3-1/4 inches) vertically apart and drill two holes into the wall.
5. Install the screws (not supplied) into the wall, leaving a gap of approximately 3 mm

(1/8 inches) between the screw head and the wall.

6. Align the mounting holes with the screws and mount the SX5 onto the screws - see Figures

15 and 16.

Connect the SX5 to AC Power

1. A protective earth (safety ground) terminal screw marked with a protective earth symbol is pro-

vided on the back of the SX5 - see Figure 17. Connect this terminal to a good earth ground
(i.e., a cold water pipe) by means of an 18 gauge or heavier insulated wire. The wire insulation
should be green with a yellow stripe to indicate that this is a protective earth (safety ground)
connection.

2 Connect the barrel connector of the power supply to the AC power input on the rear panel of

the SX5 - see Figure 17.

3. Plug the AC power cord into the power supply.
4. Turn the AC/Battery switch to the AC position.
5. Plug the AC power cord into the wall socket. The SX5 will power up automatically.
6. Check the cellular signal strength and move the unit until the best signal possible is

achieved - see the Service Indication section of this manual.

Figure 17 – SX5 AC power connection.

AC Power Cord

Wall Socket

Power Supply

AC Power

Input

Barrel

Connector

Figure 16 – Mount the SX5 onto the screws.

83 mm (3-1/4 inches)

Figure 15 – SX5 mounting hooks.

Mounting

Holes

AC/Battery Switch

Protective Earth

Terminal Screw

Protective Earth

Symbol

Advertising