Set active day watering schedules – Toro Plus Series Satellite User Manual

Page 7

Advertising
background image

Set Active Day Watering Schedules

The active watering days for each program can be chosen using a Calendar schedule or an Interval
schedule. The Calendar schedule enables active days to be selected within a 14-day (two week) cycle. The
Interval Schedule enables active days to be selected by a specific interval, such as every day, every-other
day, every-third day and so on – up to every twenty-ninth day.

Select the active watering days for each program using either a Calendar schedule (below) or an Interval
schedule (on page 8).

Note the following programming characteristics:

• Only one watering day schedule (Calendar or Interval) can be utilized for each program.

• To prevent automatic operation of any program, all days in a Calendar Schedule can be deleted or

Interval Day can be set to Off.

To Set a Calendar schedule:

1. Press

as needed to select the Program indicator.

2. Press

to select the Active Days indicator.

3. Press

or

until the desired program number (1 – 16) is

flashing.

4. Press

– The schedule type will begin flashing.

5. Press or until

CA (Calendar) is flashing.

6. Press

– The current Calendar schedule is displayed and

Sunday (Su) of week 1 is flashing.

7. Choose to select or delete the indicated (flashing) day.

• To select: Press

– The day stops flashing and remains

displayed and the next day starts flashing.

• To delete: Press

– The day disappears and next day starts

flashing.

8. Repeat step 7 to set the 14-day watering schedule.

Note: To prevent automatic operation of the program, delete all 14
days or, as an alternate method, select Interval “Off”. See page 8 for
this procedure.

9. Press

to enter the information into controller memory.

10. Repeat steps 3 9 for all programs requiring a Calendar

schedule.

Note: If an Interval watering schedule is not required, programming
for automatic operation is now complete. When an automatic program
starts, the displays will alternate between the time/day and program
status. If two or more programs are operating concurrently, the display
will alternate to show status of each program.

ENTER

START

7

:

:

8 9 10 11 12 13 14

Week 2

Mo

We

1 2 3 4 5 6 7

Week 1

Su

Fr

Fr

We

Mo

:

Program No.

Schedule Type

(Calendar)

:

Fr

:

:

AM

Sta #

Sta Run Time

Pgm #

Advertising