24 and 16 Port Smart Switch II – User Manual

Page 7


Completing the Installation

When the switch has been installed as specified above, then the unit
can be configured as detailed below: -

1. Apply AC power to the switch. The green Power LED on the front

panel should light.

2. Connect the Cat. 5/5e twisted pair cables from the network

partner devices to the RJ-45 ports on the front panel of the switch.
When a connection is obtained, the green LK/ACT LED
associated with the port will light.

3. If the fibre uplink is used, then connect the fibre link to the partner

device (media converter, fibre NIC card or fibre switch etc). Verify
that the green Link LED on the fibre module is lit which indicates
that the optical link is valid.

4. If advanced modes such as port-based VLANs are needed, then

use the console port to configure the switch.

5. If legacy devices that do not support auto-negotiation are

connected to the RJ45 ports then it may be necessary to
configure the switch to match the speed and duplex modes of the
partner devices.

6. Note that auto-negotiation can take up to 30 seconds to complete

depending on the partner device.


Product Number 0-1591093-x 0-1591047-x Issue 1