Belts cont, Maintenance schedule – Tanaka TPB-400GX User Manual

Page 12

Advertising
background image

ADJUSTING THE BELTS (con’t)

1.The correct tension is achieved when the total up and down play of the small clutch
belt is approximately ½” and the larger drive belt is approximately 1”.

2. Adjusting the belts:

a. Turn the two belt tension bolts, located on the outside of
the drive belt frame plates as indicated in figure 15 until
approx. ½” of play is present.

b. Next, using two 17mm wrenches, loosen the axle bolt
on the rear wheel. With the axle loose, adjust the rear
adjuster bolts (figure 16), until there is approx. 1” of total
play present. Make sure that the wheel is properly aligned
with the frame of the powerboard and re-tighten the rear
wheel axle. Cautiously ride the powerboard the first time
to ensure that everything is in proper working order after
every adjustment.







MAINTENANCE SCHEDULE


Proper care of your powerboard will insure optimal performance and longer life span.
The following are a few maintenance suggestions that will keep your powerboard
running in top condition:

Daily

Maintenance - Perform each time you ride your unit.

Clean the exterior of the unit with a soft, damp rag.

Check that all nuts and bolts are securely tightened.


Weekly/Monthly Maintenance

Check the starter, especially the cord and return spring.

Remove the spark plug and check the electrode gap. Adjust it to 0.6 mm
(.024”), or change the spark plug.

Clean the cooling fins on the cylinder head and check that the air intake at the
starter is not clogged. Clean the air filter.

Page 12

Advertising
This manual is related to the following products: