ULTRA-AIRE 100V CONTROL PANEL INSTALLATION

1. The following installation instructions are for both new

construction and retrofit applications. For new construction, it is
recommended that the control box be installed after the drywall is
in. Prior to drywall installation, the control wires can be positioned
to come through the drywall about 5' 2" above the floor and at
least 3" left or right of any stud.

2. Locate the box bottom about 5' above the floor. Locate the left

and right box sides at least 2" from any stud. Use the back of the
control box as a template to make the rectangular drywall cutout
(5-13/16" wide by 4-1/16" high). DO NOT oversize the cutout,
especially the height.

3. Feed the low voltage control wires into the box back through the

rubber grommet.

4. Place the box in the hole and put the mounting tabs through the

slots in the box sides as shown.

5. Place the two 3⁄4" long, #8 screws through the tab slots and into

the holes in the box sides.

6. Tighten the screws until the tab ears press firmly against the

drywall back, causing the upper and lower box flanges to press
tightly against the drywall front.

7. Connect the control wires to the control panel leads per the

installation sheet taped to the Ultra-Aire side or per the manual.

8. Fasten the control panel to the box flanges with the 1⁄2" long, #6

screws provided.

9. Slide the cover over the control panel screw head at the panel top

so it catches in the keyhole on the back of the cover (see detail
below). The cover hides the control panel when it is not being
programmed.

10. The sheet under the cover glass can be replaced with artwork of

the customers’ choice.

19

Ultra-Aire 100V Installer’s & Owner’s Manual

Advertising