Adjust rollers, Install active panels – Therma-Tru Smooth-Star User Manual

Page 12

Advertising
background image

11

Using a screw driver, turn adjustment
screws in rollers left or right until panel
is level and glides smoothly across the
track.

Close panel to within 1/4 of lock jamb.
Use visual margin to assure panel is
adjusted straight with frame.

"

ADJUST ROLLERS

17

INSTALL ACTIVE PANELS

16

Head Jamb

Exterior

Interior channels

Interior

From interior side of system, install active
panel up into interior channels in head jamb.
Push upwards as far as possible and rotate
into place until rollers engage sill roller track.

As a reference, the exterior side of the
panel is always the pre-finished side.

Repeat for second active panel.

To inactive panel

To center of unit

Advertising
This manual is related to the following products: